- 25 SEPT 2014
IN THE OCCASION OF OUR 20 YEARS ANNIVERSARY WE HOSTED MORE THEN 100 CUSTOMERS WHO ATTENDED SEMINARS AND WORKSHOPS. WE ARE PROUD OF THIS SUCCESS AND THANKFUL TO OUR CUSTOMERS AND PARTNERS. - 09 SEPT 2014
THE SIEMENS PS 2 POSITIONERS ARE NOW AVAILABLE ON STOCK WITH SEVERAL OPTIONS TO COVER A WIDE RANGE OF NEEDS. THIS STEP FOLLOWS SEVERAL INSTALLATIONS ON BOARD OF OUR CONTROL VALVES THAT WE HAVE DELIVERED AND COMMISSIONED ALL AROUND ITALY. - 07 JUL 2014
FLUIDTECNICA IS NOW APPROVED SUPPLIER OF ENI GROUP, WE ARE PROUD TO BE LISTED AT THE BIGGER ITALIAN COMPANY AND ONE OF THE WORLD BIG PLAYER IN OIL AND GAS.A NEW CHALLENGE FOR OUR TEAM. - 13 MAR 2014
WE WILL DELIVER A FULL PACKAGE OF CONTROL VALVES, STOP VALVES AND STRAINERS FOR ENGINES TEST RIGS WITH A DESIGN TEMPERATURE OF -60∞C. SPECIAL MATERIALS AND DESIGN HAVE BEEN PROVIDED FROM OUR PARTNER ARI-ARMATUREN. - 14 OCT 2013
WE HAVE DELIVERED AND SUCCESFULLY TESTED AND COMMISSIONED TWO COMBINED ZWICK TRI-CHECK AND ACTUATED STOP, ADDING A PERFECT SHUT-OFF FUNCTION TO THE ANTI-SLAM ZERO LEAKAGE CHECK BASE SERVICE. THE VALVES REPLACE A STOP AND A CHECK VALVE ON A HOT WELL PUMPING STATION. - 28 GIU 2013
WE SUPPORTED HORA TO SELL, DELIVER AND COMMISSION A COMPLETE TURBINE BY-PASS STATION DESIGNED FOR THE EXTREME PARAMETERS OF ULTRA-SUPERCRITICAL STEAM AT 705∞C/ 365 BAR, DESTINATED TO THE ENEL ENCIO PROJECT IN FUSINA. THE VALVES ARE MADE OUT OF NICKEL BASED ALLOY 617. WE HAVE HIT THE TOP OF THE VALVE WORLD. - 24 APR 2012
WORKING IN STRICT COOPERATION WITH OUR PARTNERS AND WELL-TRAINED AUTHORIZED SERVICE COMPANY, WE ARE NOW ABLE TO MAINTAINE AND REFURBISH ANY KIND OF VALVE AND ACTUATOR WITH ORIGINAL SPARES. ORIGINAL PERFORMANCE AND CERTIFIED PRESSURE AND TIGHTNESS TEST ARE PART OF EACH AND EVER SUPPLY. - 05 APR 2012
WE ARE DELIVERING SEVERAL ARI VALVES (FABA, STEVI, SAFE) AND ALL-IN-ONE STEAM TRAPS TO ONE OF THE MOST IMPORTANT STEAM PROJECT IN SOUTH PIEMONTE. THE NEW PROJECT INCLUDES A COMPLETE BOILER ROOM, STEAM MANIFOLDS, THERMO-PHYSICAL DEGASSER AND A STEAM LINE LONGER MORE THEN 300 MT. - 12 MAR 2012
SOME HD2000 (PERSTA HIGH PRESSURE CLASS 3200 GLOBE VALVES) WITH F91 BODY ARE UNDER PERFORMANCE TEST AFTER BEING INSTALLED ON DRAINAGE SERVICE OF COAL FIRED AND COMBINED CYCLE POWER PLANTS. WE ARE SURE TO OUTSTAND CUSTOMER REQUIREMENT AND MAINTENANCE DEPARTMENTS EXPECTATIONS. - 12 MAR 2012
ZWICK VALVES ARE NOW AVAILABLE WITH SIL 3 CERTIFICATE WITH CERTIFIED PNEUMATIC AND HYDRAULIC ACTUATORS.